Water

Wilkesboro Water Treatment Plant Improvements

Client
Town of Wilkesboro
Date
2016
Disciplines
Construction Administration & Inspection
Water & Wastewater Engineering
Objectives

The Town of Wilkesboro requested that Davis & Floyd prepare a technical memorandum and cost estimate to review potential changes to its sludge handling systems for its existing 10-MGD water treatment plant once the raw water source was relocated from the nearby Yadkin River to the W. Kerr Scott Reservoir in Wilkes County. The Town then commissioned Davis & Floyd to design and implement the recommended upgrades.

Scope

Prepared a technical memorandum and cost estimate

Designed automatic vacuum sludge collection system for existing sedimentation basins, new mixing system in the existing sludge holding tank, replacement of existing sludge drying beds with a new centrifuge, conveyor system, and truck loading building

Converted existing sludge drying bed areas into enclosed storage for future use

Outcome

Davis & Floyd recommended and designed upgrades to the Town's 10-MGD water treatment plant.